Hot search: services  energy  heat  Business  Five-year  natural  power  electric  economy  Industrial 
 
Home > News > Market > Content

San Diego Will Have Many Stories to Tell When It Is Completed in Mid-2013

increase font size  reduce font Add date: 2016-11-30  Hits:82
Core prompt: The New Central Library in downtown San Diego will have many stories to tell when it is completed in mid-2013. Not only from the books on the shelves, but

The New Central Library in downtown San Diego will have many stories to tell when it is completed in mid-2013. Not only from the books on the shelves, but from the old cars, worn out appliances and other pieces of scrap metal that were melted and transformed into high-quality rebar for the project. Of the 6,650 tonnes of reinforcing steel that Gerdau fabricated and installed at the 294,673 square foot facility, between 85 and 99% came from recycled materials.

Mr David Perkins vice president of Gerdau Reinforcing Steel West said that "Many people do not realize that steel is the most recycled material on the planet, more than paper, aluminum, plastic and glass combined. It is an amazing product because its metallurgical properties allow it to be recycled again and again without degradation in performance."

The nine story building was designed by San Diego architect Rob Quigley and is being built by Turner Construction Company. It will be more than twice the space of the former library and include a three-story domed reading room, a children's library, a charter high school, six meeting rooms, 407 computer stations and two levels of underground parking. Gerdau became involved with the project in November 2010 through an $8.7 million contract with Turner Construction Company.

The New Central Library aims to achieve a LEED Silver certification upon completion, which is accomplished by earning points in categories including sustainable site, water efficiency, energy and atmosphere, materials and resources, indoor environmental quality and innovation and design process.

Gerdau can help earns points for these types of projects due to the recycled content of steel and in many cases, for being a regional product. With 20 steel mills and more than 50 downstream fabrication facilities across North America, a Gerdau facility is often found within 500 miles of major construction projects. By sourcing materials from a limited radius, the carbon footprint of a project is reduced because less gas or coal is needed for transporting materials.

In the case of the New Central Library, the rebar was fabricated at Gerdau's San Bernardino Reinforcing Steel facility, located approximately 110 miles away

Gerdau can also help obtain as many as five LEED points in the innovation and design process. Through the Gerdau Construction Solutions Integrated Team approach, projects benefit from specialty subcontractor participation and knowledge to minimize waste, optimize design solutions and improve constructability.

Gerdau is a member of the U.S. Green Building Council, which developed the LEED building rating system, and has been involved in many projects that successfully achieved a LEED certification. The company is one of America's biggest recyclers, contributing to environmental preservation and reducing the quantity of material deposited in landfills and at inappropriate sites. By using scrap steel in its steel production process, Gerdau recycling of steel scrap also reduces energy use and, as a consequence, CO2 emissions.

 
 
 
[ NewsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Total0bar [View All]  Related Comments

 
Photo Recommended
Recommend News
Click Rank
 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed